Every one that I have come across when discussing the new Trinity Skyline Trail noted as everyone else did that there were trails on both sides of the Trinity but no one could state with any certainty where the bike trail would cross to the other side. Today, I found out. The city parks and recreation guys are pretty knowledgeable about what's going on and with the aid of a supervisor from all-places, Burkburnett, Texas, could even provide more information since his company was the project contractor. Burkburnett,Texas
is west of Wichita Falls just 2 miles off the I-44 bridge crossing into Oklahoma. That is right at 100 miles to go home or to come to work. Later, I was thinking that my uncle who was an electrician and driving that distance every day was just part of the job. He worked on Cobo Hall when it was being built with the Joe Arena. Now, the Joe is being torn down.Then, he worked for years upgrading Detroit Wayne County Airport. That's Metro. So distance like that isn't really a problem if you want to work.
I had gone down to the Anatole to see if the Michigan Spartans were meeting the public but I had missed the events for the day. On the return, driving out Harry Hines to see if the new Parkland Hospital was clearing out the fences so a shot of the magnificent architecture could finally be taken. Usually, it takes five or six trips to check on the best times for sunlight--morning--afternoon--evening. During the Margaret Hunt Hill Bridge build, it turned out that the best sun is afternoons between 3PM and 5PM in the winter months. This time of year when the angle of the sun is still low, even the morning shots can be more silhouette than morning sun normal. As I crossed the new Sylvan bridge, I saw a car at the new ramp that goes down to the boat docks and the parking lots of Trammel Crow Park. I turned around and came back and went down the new ramp. Later, the contractor super told me that he and the crew opened the ramp to traffic last night. Today, the crew was setting the post that blocks off all the areas of the new trail except the two parking lots and the boat ramp. He showed me where the crossing from the east bank over to the west bank would be made on the old Sylvan bridge which is at trail grade below the levees.
Now, it was clear where you could cross on the north end. For now, there must be a new crossing on the south end and I'm thinking that it will be the I-30 Maggie 2 bridge since it will have a pedestrian and bike way on the bridge. But, for now, if the weather ever comes back to normal for north Texas, I can park in the Continental Bridge parking lot or the lots at Trammel Crow and ride both sides of the river. It's marked as 6.2 miles from the old Sylvan bridge on the new trail.
There will be new wet lands north of Sylvan and the banks of the Trinity have really been cleaned up. The crews are still working and the estimated completion date is mid February, or about 6-weeks more work. The Trammel Crow lake is now drained but is being cleaned up and then will be re-flooded.
The new ramp down to Trammel Crow Park off the new Sylvan Avenue Bridge |
I had gone down to the Anatole to see if the Michigan Spartans were meeting the public but I had missed the events for the day. On the return, driving out Harry Hines to see if the new Parkland Hospital was clearing out the fences so a shot of the magnificent architecture could finally be taken. Usually, it takes five or six trips to check on the best times for sunlight--morning--afternoon--evening. During the Margaret Hunt Hill Bridge build, it turned out that the best sun is afternoons between 3PM and 5PM in the winter months. This time of year when the angle of the sun is still low, even the morning shots can be more silhouette than morning sun normal. As I crossed the new Sylvan bridge, I saw a car at the new ramp that goes down to the boat docks and the parking lots of Trammel Crow Park. I turned around and came back and went down the new ramp. Later, the contractor super told me that he and the crew opened the ramp to traffic last night. Today, the crew was setting the post that blocks off all the areas of the new trail except the two parking lots and the boat ramp. He showed me where the crossing from the east bank over to the west bank would be made on the old Sylvan bridge which is at trail grade below the levees.
Now, it was clear where you could cross on the north end. For now, there must be a new crossing on the south end and I'm thinking that it will be the I-30 Maggie 2 bridge since it will have a pedestrian and bike way on the bridge. But, for now, if the weather ever comes back to normal for north Texas, I can park in the Continental Bridge parking lot or the lots at Trammel Crow and ride both sides of the river. It's marked as 6.2 miles from the old Sylvan bridge on the new trail.
There will be new wet lands north of Sylvan and the banks of the Trinity have really been cleaned up. The crews are still working and the estimated completion date is mid February, or about 6-weeks more work. The Trammel Crow lake is now drained but is being cleaned up and then will be re-flooded.
No comments:
Post a Comment